RADIO CONTROLLED PIPE TRANSPORTER

A motorised trolley was used to install a water pipeline beneath the Hornibrook Highway. This trolley was radio controlled from the construction site and ran in the cavity below the Hornibrook Highway to carry water pipes from the loading point on the southern bank to the current work area beneath the bridge.