|
HYDROFOIL LOADING PLATFORM CONNECTING
TO OIL DRILLING RIG.
This application was a loading gangway on a hydrofoil
used to service oil rig platforms in the Timor Sea oil fields. When the
captain approached the oil rig the loading gangway was automatically driven
from its rest position above the cabin to its operating position protruding
from the bow of the boat. When the captain was close to the oil rig the
loading gangway was driven up or down in response to the trough in the
wave so as to maintain a constant height in relation to the loading platform
on the oil rig. When the loading gangway was level with the loading platform
an electromagnet was used to couple the loading gangway to the loading
platform on the oil rig. Wonderware Intouch Scada was used as a simulator
to develop and test this PLC program without the need to be onboard the
Hydrofoil to commission the system. Feedback from accelerometers was fed
back to the PLC to provide control for positioning.
|